The Process
The right way to do things
The right way to do things
First, the under-slab.
Here, we’re installing the underground plumbing before the slab is poured, including sewer and waste drainage points, stormwater lines and all required pipework. Everything is set out to the building plans and positioned ready for the next stage of construction.
Everything internal.
Next, we move into the rough-in. Here we’re installing the internal plumbing throughout the building, running hot and cold water lines, waste pipework and drainage to all required fixtures. This stage brings the plumbing into position behind the walls and throughout the structure, ready for the next stage
The Fit off Stage
This is where everything starts coming together — installing the fixtures, connecting appliances and finishing off the plumbing throughout the project. The final touches that bring the whole plumbing system to life, ready for handover.